FDOT District 4:
SR 80 Design-Build SR 15 to CR 880
As part of a design-build team with Community Asphalt, American provided engineering analysis and design services for a 3R design-build project which included milling, resurfacing and safety upgrades of 18.2 miles of SR 80 (Southern Boulevard) from SR 15 to CR 880 in Belle Glade. The project included traffic signals, tractor crossings, guardrail, bridge approach repairs, signing, and pavement markings. All improvements were in accordance with Chapter 25 of the Plan Preparation Manaual.
|
|||||
|