Featured Website
  • SR 71 Intersection Improvements, Gulf County: Design of milling, resurfacing, and pavement markings to accommodate a left-turn lane onto East River Road and drainage improvements. The existing on-street parking was converted into the through lanes to allow room for the left-turn lane. Additional work included replacing the non-compliant curb ramps. Task completed in 2006.

  • SR 296 (Michigan Ave), Escambia County: Signalization and pedestrian improvements, public involvement, ADA requirements and environmental permitting. This project included the design of a new signal at the intersection of SR 296 and Clifton Road with pedestrian accommodations. To incorporate the signal and pedestrian features, American coordinated with FDOT for the closure of one driveway and the modification of a second driveway. Also included in the design were two-midblock cross walks (one on each side of Clifton Rd.). An additional driveway had to be closed to accommodate one of the crossings. Task completed in 2006.