This project involved reconstruction and widening of a skewed intersection in Zephyrhills. The existing T-intersection had a 65 degree skew without turn lanes. American prepared a route study to develop and analyze re-alignment alternatives and to determine right-of-way needs. Final construction plans were developed which included turn lanes, bicycle lanes, drainage ponds, lighting plans and a full-signalized intersection. Right-of-way plans were prepared for the project. A public information meeting was also conducted by American’s staff.